Public-works contractors · Heavy/highway contractor · Paving/overlay
Hutchens Asphalt, LLC
NWA apparent-low bids by year
ARDOT lettings in Benton, Washington, Madison and Carroll counties
Data through 2019 · Free to reuse with the credit line. · Corrections
Dollar value of those bids
Base bid as tabulated, by letting year
Data through 2019 · Free to reuse with the credit line. · Corrections
Statewide since 2018: 6 ARDOT bids, 2 as apparent low bidder.
Every NWA bid
6 since 2018 · newest first
| Letting | Job | Project | County | Rank | Bid | Bidders | vs low bid | Bid tab |
|---|---|---|---|---|---|---|---|---|
| May 15, 2019 | C04012 | CAVE SPRINGS OVERLAY (SEL. SECS.) (S) | Benton | 2 | $315K | 3 | +6.3% | |
| May 15, 2019 | SA0855 | CARROLL CO. LEVEL & RESEAL NO. 3 (S) | Carroll | apparent low | $399K | 2 | low | |
| May 15, 2019 | 040774 | BENTON CO. LINE - BUTTERFIELD COACH RD. (S) | Washington | 2 | $8.1M | 2 | +0.7% | |
| May 15, 2019 | 090561 | HWY. 12 - I-49 (BENTONVILLE) (S) | Benton | 2 | $5.8M | 2 | +56.0% | |
| Apr 10, 2019 | 090534 | HWY. 103 - EAST (GREEN FOREST) (S) | Carroll | 2 | $1.6M | 3 | +22.4% | |
| Apr 10, 2019 | C44004 | HUNTSVILLE OVERLAY NO. 2 (SEL. SEC.) (S) | Madison | apparent low | $301K | 2 | low |
- apparent low bid
- rank 1 on ARDOT's bid tabulation; usually but not always the award (ARDOT can reject bids)
- reconciled awards nwa
- awards from ARDOT award lists whose rows add up to the printed total (17 of 163 lettings)
An apparent low bid is rank 1 on ARDOT's bid tabulation. It is usually, but not always, the award: ARDOT can reject bids, and the final contract can differ from the bid. Awards are shown as awards only where ARDOT's award list ties out.
Sources
- ARDOT bid tabulations · as of May 15, 2019
- ARDOT award lists · as of May 15, 2019